Water Supply

Water Supply Guideline: The applicant shall submit the prayer in a prescribe Form along with following documents. 1. Tax Receipt 2. Deed 3. Site Plan 4. Building Plan 5. Assessment Certify Copy 6. Layout MAP (All documents should be in Xerox copy)

Sl.No Service Name Service Fees Form Price Time Schedule   Form Download
1. Sanction of new house connection 1/4 Ferrule = 2000, 3/8 Ferrule = 2500, 12/2 Ferrule = 3000 , 5/8 Ferrule = 4000, 3/4, 1 Inch & commercial 30.00 10 Days from the receipt of application
 2. Repairing of water supply line (Minor Repairing) NA NA 7 Days
3. Arresting leakage of water in mains and wash of ferrule Rs.50.00 or Rs.500.00 20.00 2 Days
4. Change of sifting of ferrule Rs.300.00 20.00 15 Days
5. Supply of water through tanker/ lorry Big Tank = 400, Small Tank = 200.00 20.00 Within 24 hours of application
6. Stoppage of misuse of water due to malfunction removal of street taps etc NA NA 10 Days
7. Action against illegal method of taking water from municipal mains AN NA 10 Days

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to Top